Sunday, September 15, 2019

First Step for Tunnel to Eliminate Flood Risk in Istanbul - RayHaber

First Step for Tunnel to Eliminate Flood Risk in Istanbul
15/09/2019 Levent Elmastaş 34 Istanbul, RAILWAYS, GENERAL, HIGHWAYS, URBAN Rail Systems, HEADLINE, Marmara Region, TURKEY 0

The first step was taken to eliminate the risk of flooding in Istanbul

İBB President Ekrem İmamoğlu participated in the Ayvalıdere Rain Water Tunnel TBM (Tunnel Boring Machine) Lowering Ceremony to save flood risk areas in 4 districts 11 in different points. Imamoğlu stated that such works were written and drawn as individual ingenuity in populations that defeated populism. I never want and wish to be remembered on my own. I want this to be examined, perceived and served by all our colleagues, all business people, all Istanbul. If we do that, if we succeed, we will truly become patriots.

More:First Step for Tunnel to Eliminate Flood Risk in Istanbul - RayHaber